
Preventive Maintenance Manager Course
Take full control of your maintenance programme with the Preventive Maintenance Manager Course. Learn how to build, schedule, and optimise PM programmes that reduce unplanned downtime, cut costs, and keep equipment running reliably. This course covers everything from asset criticality analysis to CMMS configuration and strategic leadership.
What you'll learn:
In this course, you will learn how to design and manage a complete preventive maintenance programme from the ground up. You will develop asset registers, conduct criticality assessments, and create technically sound PM procedures with proper safety integration. You will master scheduling techniques that balance labour, parts, and production constraints to prevent backlog buildup. The course also covers CMMS setup, condition monitoring integration, and data-driven interval optimisation. You will learn how to track KPIs, lead continuous improvement cycles, and present PM performance to leadership. By the end, you will have the tools and knowledge to build a high-performing PM programme that delivers measurable reliability and cost results.
How you study in practice Preventive Maintenance Manager Course
How you practise Preventive Maintenance Manager Course
For businesses looking to train their team
With Dedika for businesses, the course includes exercises and examples tailored to your own business and the way your company needs.
Course content
8 Chapters • 40 LessonsDuration between 4 and 360 hours (you decide)
Chapter 1HideHide detailsSee detailsFoundations of Preventive Maintenance
Foundations of Preventive Maintenance
Lesson 1 • Defining Preventive Maintenance
Covers PM definition, scope, and distinction from reactive and predictive strategies. Anchors all subsequent chapters in shared vocabulary.
Lesson 2 • Roles and Responsibilities in PM
Maps stakeholder roles from technicians to executives in a PM programme. Clarifies accountability structures students will manage.
Lesson 3 • Types of PM Tasks and Intervals
Classifies time-based, usage-based, and condition-based PM tasks. Provides the task taxonomy used throughout the course.
Lesson 4 • Introduction to Maintenance Metrics
Introduces MTBF, MTTR, PM compliance rate, and availability as foundational KPIs. Sets measurement baseline for later performance chapters.
Lesson 5 • Business Case for PM Programmes
Quantifies cost avoidance, uptime gains, and safety benefits of structured PM. Connects PM investment to measurable organisational outcomes.
Chapter 2HideHide detailsSee detailsAsset Inventory and Criticality Analysis
Asset Inventory and Criticality Analysis
Lesson 1 • Creating a Comprehensive Asset Register
Covers data fields, naming conventions, and hierarchy for asset records. A complete register is the prerequisite for all PM planning activities.
Lesson 2 • Failure Mode Identification
Introduces FMEA principles to identify how assets fail and what PM tasks prevent each mode. Links failure modes directly to task selection.
Lesson 3 • Criticality Assessment Methods
Teaches risk matrix, weighted scoring, and failure consequence analysis for ranking assets. Criticality scores drive PM frequency and resource decisions.
Lesson 4 • Prioritising Assets for PM Coverage
Applies criticality scores to determine which assets receive full, partial, or run-to-failure treatment. Ensures PM effort matches actual risk.
Chapter 3HideHide detailsSee detailsPM Task Development and Documentation
PM Task Development and Documentation
Lesson 1 • Establishing Task Frequencies
Uses OEM recommendations, failure history, and criticality scores to set defensible intervals. Frequency decisions directly affect PM programme effectiveness.
Lesson 2 • Safety and Lockout/Tagout Integration
Embeds energy isolation, PPE requirements, and hazard warnings into PM task documents. Safety integration is mandatory before any field deployment.
Lesson 3 • Writing Effective PM Procedures
Covers step-by-step instruction writing, action verb usage, and acceptance criteria. Well-written procedures reduce errors and training time.
Lesson 4 • Document Control and Version Management
Establishes revision control, approval workflows, and archiving for PM documents. Prevents use of outdated procedures in the field.
Lesson 5 • Work Order Structure and Data Fields
Defines required work order fields, priority codes, and completion data for PM tasks. Proper structure enables performance tracking and analysis.
Chapter 4HideHide detailsSee detailsPM Scheduling and Resource Planning
PM Scheduling and Resource Planning
Lesson 1 • Scheduling Principles and Constraints
Covers production windows, shutdown opportunities, and labour capacity as scheduling inputs. Understanding constraints prevents schedule overload and missed PMs.
Lesson 2 • Annual and Weekly PM Planning
Translates task frequencies into annual calendars and weekly work packages. Balanced loading prevents backlog buildup and technician overload.
Lesson 3 • Managing PM Deferrals and Backlog
Establishes deferral approval criteria, risk documentation, and backlog reduction strategies. Uncontrolled deferrals erode PM programme integrity.
Lesson 4 • Spare Parts and Materials Planning
Aligns parts procurement with PM schedules to ensure material availability at task time. Parts shortages are a leading cause of PM deferrals.
Lesson 5 • Contractor and Vendor Coordination
Manages external service providers for specialised PM tasks within the overall schedule. Contractor integration requires scope definition and performance standards.
Chapter 5HideHide detailsSee detailsComputerised Maintenance Management Systems
Computerised Maintenance Management Systems
Lesson 1 • Data Quality and Master Data Management
Covers data standards, duplicate prevention, and audit processes for CMMS records. Poor data quality undermines scheduling accuracy and performance reporting.
Lesson 2 • Configuring PM Triggers and Auto-Generation
Sets up time, meter, and event-based triggers to auto-generate PM work orders. Automation reduces manual scheduling effort and missed task generation.
Lesson 3 • CMMS Reporting and KPI Dashboards
Builds standard PM performance reports and real-time dashboards from CMMS data. Reports drive the management decisions covered in later chapters.
Lesson 4 • Mobile Work Order Execution
Enables technicians to receive, execute, and close PM work orders via mobile devices. Mobile execution improves data capture speed and accuracy.
Lesson 5 • CMMS Architecture and Core Modules
Maps asset, work order, inventory, and reporting modules and their interdependencies. Understanding architecture prevents data entry errors and reporting gaps.
Chapter 6HideHide detailsSee detailsPM Programme Performance Management
PM Programme Performance Management
Lesson 1 • PM Task Effectiveness Review
Evaluates whether individual PM tasks are preventing failures or consuming resources without benefit. Ineffective tasks are revised or eliminated.
Lesson 2 • Key Performance Indicators for PM
Defines PM compliance, wrench time, schedule attainment, and cost per PM as primary KPIs. KPI selection determines what behaviours the programme reinforces.
Lesson 3 • Continuous Improvement Cycles
Applies Plan-Do-Check-Act cycles to sustain PM programme improvement over time. Structured cycles prevent regression after initial programme gains.
Lesson 4 • Interval Optimisation Techniques
Uses failure history, condition data, and reliability models to refine PM intervals. Optimised intervals reduce cost whilst maintaining or improving reliability.
Lesson 5 • Root Cause Analysis for PM Failures
Applies 5-Why and fishbone methods to recurring failures that PM should have prevented. RCA findings feed directly into task and interval improvements.
Chapter 7HideHide detailsSee detailsCondition Monitoring and Predictive Integration
Condition Monitoring and Predictive Integration
Lesson 1 • Establishing Condition Baselines
Defines healthy-state baselines and alert thresholds for monitored parameters. Baselines are required before any condition trend can be interpreted.
Lesson 2 • Condition Monitoring Technology Overview
Surveys vibration analysis, thermography, oil analysis, and ultrasound as primary CM tools. Technology selection depends on failure mode and asset criticality.
Lesson 3 • Integrating CM Data into the CMMS
Routes condition monitoring alerts to CMMS work order generation and asset history. Integration closes the loop between monitoring and maintenance action.
Lesson 4 • Building a Reliability-Centred Maintenance Bridge
Positions PM and CM within an RCM framework to align task selection with failure consequences. RCM thinking elevates PM from routine to strategic.
Lesson 5 • Adjusting PM Tasks Based on Condition Data
Uses CM findings to extend, reduce, or replace time-based PM tasks with condition triggers. Data-driven adjustments improve cost efficiency and reliability.
Chapter 8HideHide detailsSee detailsStrategic PM Programme Leadership
Strategic PM Programme Leadership
Lesson 1 • Cross-Functional Collaboration
Coordinates PM programme needs with operations, engineering, procurement, and finance teams. Effective collaboration prevents scheduling conflicts and resource gaps.
Lesson 2 • Developing a PM Programme Strategy
Aligns PM programme goals with organisational reliability, safety, and cost objectives. A documented strategy provides direction and justifies resource requests.
Lesson 3 • Budget Development and Justification
Builds PM budgets using labour, parts, contractor, and technology cost components. Justification requires linking spend to reliability and risk reduction outcomes.
Lesson 4 • Benchmarking and Industry Best Practices
Compares PM programme metrics against industry benchmarks to identify performance gaps. External benchmarking validates internal targets and inspires improvement.
Lesson 5 • Change Management for PM Implementation
Applies structured change management to overcome resistance and sustain PM adoption. Cultural change is the most common barrier to PM programme success.
Lesson 6 • PM Programme Maturity Assessment
Uses maturity models to benchmark current PM programme state and identify advancement priorities. Maturity assessment guides the multi-year improvement roadmap.
Your valid completion certificate
This course is for you:
Maintenance supervisors ready to move from reactive to structured PM programmes.
Reliability engineers who want to strengthen their maintenance management skill set.
Plant managers seeking to reduce equipment failures and control maintenance costs.
Maintenance planners looking to formalise scheduling and work order processes.
Operations professionals transitioning into dedicated maintenance management roles.
Facilities managers responsible for keeping critical assets running safely and efficiently.
What our students say
Your lessons are perfect. I purchased the one-year package and finally have the opportunity to follow various topics of interest without needing to change platforms... I'm grateful for everything you do, I've already recommended you to other people...

I like how the lessons are straight to the point and how I can change chapters and skip content I don't need.

I like the content and the way videos are presented and transcribed, which speeds up the process!

The platform is fast and simple to use. The diversity of content and complementary videos really help with learning.

Top upskilling courses
FAQ
Who is Dedika?
Is the certificate valid in Australia?
Are the courses free?
What is the course workload?
What are the courses like?
How do the courses work?
What is the duration of the courses?
What is the cost or price of the courses?
What is an EAD or online course and how does it work?
PDF Course




















