Primavera Course
Over 400,000 professionals on the platform
Exclusive for businesses

Primavera Course

Master Primavera P6 from the ground up and gain the scheduling skills that construction and engineering professionals rely on every day. This course takes you from basic navigation all the way through resource loading, earned value analysis, and enterprise reporting. Whether you're new to P6 or looking to sharpen your expertise, you'll finish ready to build, track, and deliver professional-grade project schedules.

Dedika for students

What your team will master:

You will learn how to set up and navigate Primavera P6, build a complete Work Breakdown Structure, and create a fully linked activity network using CPM logic. The course covers resource and cost management, schedule compression techniques, and earned value metrics including CPI and SPI. You will create and maintain baselines, update live project progress, and generate custom reports and portfolio dashboards. Advanced topics include risk management, integration with Excel and Microsoft Project, and compliance with industry scheduling specifications. By the end, you will have the practical skills to manage complex project schedules in a professional environment.

How your team learns in practice Primavera Course

How your team practices Primavera Course

Professionals from these companies study at Dedika

ActemiumFR
Nunner LogisticsNL
GT Constructora GeotécnicaCR
Sydel StarBR
Metrô de São PauloBR
Aguas AndinasCL
DSMIN
MeridianbetRS
CDHCN

Course Content

8 Chapters • 38 LessonsDuration between 4 and 360 hours (you decide)

Chapter 1See details

Introduction to Primavera P6

  • Lesson 1 • Setting Up User Preferences

    Configures date formats, time units, and display options to match workplace standards. Proper setup prevents data-entry errors in later chapters.

  • Lesson 2 • Project Management Fundamentals

    Covers key PM concepts—scope, schedule, cost, and resources—as they apply in P6. Establishes the vocabulary needed throughout the course.

  • Lesson 3 • Enterprise Project Structure Overview

    Explains the EPS, OBS, and project hierarchy that govern all data in P6. Understanding this structure is prerequisite to creating any project.

  • Lesson 4 • Navigating the P6 Interface

    Introduces the P6 desktop and web interfaces, menus, and toolbars. Students gain confidence moving between modules without getting lost.

Chapter 2See details

Creating and Configuring Projects

  • Lesson 1 • Configuring Project Calendars

    Creates and assigns global and project calendars with work hours and exceptions. Calendars drive all duration and date calculations in the schedule.

  • Lesson 2 • Using Project Codes and UDFs

    Defines project codes and user-defined fields to classify and filter projects. These metadata tools enable portfolio-level reporting introduced in later chapters.

  • Lesson 3 • Defining Project Properties

    Covers the Project Details tabs—General, Dates, Budget, and Settings. Accurate properties ensure correct baseline and cost calculations later.

  • Lesson 4 • Creating a New Project

    Walks through the New Project wizard, setting ID, name, planned start, and EPS placement. Each field directly affects reporting and data integrity.

  • Lesson 5 • Importing and Exporting Project Data

    Demonstrates XER, XML, and spreadsheet import/export workflows. Data exchange skills are essential for collaborating with external stakeholders.

Chapter 3See details

Building the Work Breakdown Structure

  • Lesson 1 • Creating WBS Elements in P6

    Demonstrates adding, indenting, and reordering WBS nodes in the WBS view. Hands-on practice cements the hierarchy before activities are added.

  • Lesson 2 • WBS Summary Bands and Reporting

    Uses WBS summary bands to display rolled-up dates, costs, and progress. Summary views give managers a high-level snapshot without activity detail.

  • Lesson 3 • WBS Concepts and Best Practices

    Explains deliverable-based decomposition, WBS levels, and coding conventions. A sound WBS prevents scope gaps and supports accurate cost rollups.

  • Lesson 4 • Assigning WBS Codes

    Configures automatic and manual WBS code schemes for identification and sorting. Consistent codes are required for filtering and reporting in later chapters.

Chapter 4See details

Defining Activities and Relationships

  • Lesson 1 • Constraints and Deadlines

    Applies start-on, finish-no-later-than, and mandatory constraints alongside deadlines. Overuse of constraints masks true schedule risk, so judicious use is emphasized.

  • Lesson 2 • Estimating Activity Durations

    Applies analogous, parametric, and three-point estimation techniques within P6. Reliable duration estimates are the foundation of a credible schedule.

  • Lesson 3 • Creating Logical Relationships

    Builds FS, SS, FF, and SF relationships using the Relationships dialog and Gantt links. Correct logic eliminates open ends and drives the critical path.

  • Lesson 4 • Activity Types and Properties

    Explains task-dependent, resource-dependent, level of effort, and milestone activity types. Choosing the correct type ensures accurate duration and resource calculations.

  • Lesson 5 • Applying Lags and Leads

    Adds positive lags and negative leads to relationships to model real-world overlaps and delays. Proper lag use avoids artificial float and schedule distortion.

Chapter 5See details

Scheduling and Critical Path Analysis

  • Lesson 1 • Understanding Float and Critical Path

    Interprets total float, free float, and the critical path produced by forward and backward passes. Float values guide prioritization of management attention.

  • Lesson 2 • Schedule Health Checks

    Runs built-in schedule quality checks against industry metrics for logic density and float. A healthy schedule is a prerequisite for reliable baseline creation.

  • Lesson 3 • Schedule Compression Techniques

    Applies fast-tracking and crashing to shorten the critical path within P6. Students evaluate cost and risk trade-offs before committing to compression.

  • Lesson 4 • Running the Schedule Calculation

    Configures and executes the Schedule function, reviewing data date and calculation options. Understanding these settings prevents common scheduling errors.

  • Lesson 5 • Analyzing Schedule Logic

    Uses the Activity Network view and Trace Logic to verify relationship correctness. Logic errors found here prevent costly rework after baselining.

Chapter 6See details

Resource and Cost Management

  • Lesson 1 • Analyzing Resource and Cost Data

    Uses histograms, spreadsheets, and usage profiles to review loading and spending plans. Visual analysis reveals peaks and gaps before the project begins execution.

  • Lesson 2 • Resource Leveling

    Applies automatic and manual leveling to resolve over-allocations within float limits. Leveling produces a feasible schedule that respects resource availability.

  • Lesson 3 • Cost Accounts and Budget Setup

    Links activities to cost accounts and enters budget at completion values. Cost accounts enable financial reporting aligned with organizational chart of accounts.

  • Lesson 4 • Setting Up the Resource Library

    Creates labor, nonlabor, and material resources with rates, calendars, and limits. A well-structured library ensures consistent cost calculations across all projects.

  • Lesson 5 • Assigning Resources to Activities

    Uses the Resource Assignment window to link resources and set units or quantities. Assignments drive both schedule duration and budgeted cost calculations.

Chapter 7See details

Baselines and Project Tracking

  • Lesson 1 • Updating Activity Progress

    Records actual start, actual finish, remaining duration, and percent complete for in-progress activities. Accurate updates are the foundation of reliable earned value metrics.

  • Lesson 2 • Statusing the Schedule

    Advances the data date and reschedules to reflect current project status. This process produces updated early/late dates and revised float values.

  • Lesson 3 • Creating and Assigning Baselines

    Copies the approved schedule as a baseline and assigns it as the project or primary baseline. The baseline is the immutable reference for all variance analysis.

  • Lesson 4 • Earned Value Management in P6

    Calculates BCWS, BCWP, ACWP, SPI, and CPI using P6's earned value module. EVM metrics provide objective performance measurement against the approved baseline.

  • Lesson 5 • Variance Analysis and Reporting

    Compares current schedule to baseline using variance columns and bar chart overlays. Variance identification drives corrective action decisions covered in the next chapter.

Chapter 8See details

Reporting and Advanced Features

  • Lesson 1 • Creating Custom Layouts and Views

    Designs Gantt, spreadsheet, and activity network layouts with custom columns and filters. Tailored layouts accelerate stakeholder communication and status reviews.

  • Lesson 2 • Global Change and Mass Updates

    Applies Global Change rules to update multiple activities simultaneously based on conditions. Batch updates save time and ensure consistency across large schedules.

  • Lesson 3 • Dashboards and Portfolios

    Configures portfolio dashboards with KPI portlets for executive-level visibility. Portfolio views aggregate data across multiple projects for strategic decision-making.

  • Lesson 4 • Building Reports in P6

    Uses the Report wizard and Report Editor to create tabular and graphical project reports. Custom reports replace manual data extraction and reduce reporting errors.

  • Lesson 5 • P6 Administration Essentials

    Covers user accounts, security profiles, and admin preferences for enterprise P6 setup. Proper administration protects data integrity and controls access across the organization.

Certification

Your valid completion certificate

This course is for you:

  • Project coordinator: needs to move beyond spreadsheets into professional scheduling tools.

  • Field engineer: manages site work but lacks formal schedule ownership and control.

  • Construction manager: wants to interpret and challenge P6 schedules with confidence.

  • Career changer: transitioning from operations or admin into a project controls role.

  • Junior planner: has P6 access at work but has never received structured training.

  • Civil engineering graduate: entering the workforce and building a competitive technical skill set.

Related Courses

FAQ

Who is Dedika?

Is the certificate valid in Canada?

Are the courses free?

What is the course workload?

What are the courses like?

How do the courses work?

What is the duration of the courses?

What is the cost or price of the courses?

What is an EAD or online course and how does it work?

PDF Course