
Primavera Course
Master Primavera P6 from the ground up and gain the scheduling skills that construction and engineering professionals rely on every day. This course takes you from basic navigation all the way through resource loading, earned value analysis, and enterprise reporting. Whether you are new to P6 or looking to sharpen your expertise, you will finish ready to build, track, and deliver professional-grade project schedules.
What you will learn:
You will learn how to set up and navigate Primavera P6, build a complete Work Breakdown Structure, and create a fully linked activity network using CPM logic. The course covers resource and cost management, schedule compression techniques, and earned value metrics including CPI and SPI. You will create and maintain baselines, update live project progress, and generate custom reports and portfolio dashboards. Advanced topics include risk management, integration with Excel and Microsoft Project, and compliance with industry scheduling specifications. By the end, you will have the practical skills to manage complex project schedules in a professional environment.
How you study in practice Primavera Course
How you practise Primavera Course
For companies looking to train their teams
With Dedika for Businesses, the course includes exercises and examples tailored to your own business and the specific needs of your company.
Course content
8 Chapters • 38 LessonsDuration between 4 and 360 hours (you decide)
Chapter 1HideHide detailsSee detailsIntroduction to Primavera P6
Introduction to Primavera P6
Lesson 1 • Setting Up User Preferences
Configures date formats, time units, and display options to match workplace standards. Proper setup prevents data-entry errors in later chapters.
Lesson 2 • Project Management Fundamentals
Covers key PM concepts—scope, schedule, cost, and resources—as they apply in P6. Establishes the vocabulary needed throughout the course.
Lesson 3 • Enterprise Project Structure Overview
Explains the EPS, OBS, and project hierarchy that govern all data in P6. Understanding this structure is prerequisite to creating any project.
Lesson 4 • Navigating the P6 Interface
Introduces the P6 desktop and web interfaces, menus, and toolbars. Students gain confidence moving between modules without getting lost.
Chapter 2HideHide detailsSee detailsCreating and Configuring Projects
Creating and Configuring Projects
Lesson 1 • Configuring Project Calendars
Creates and assigns global and project calendars with work hours and exceptions. Calendars drive all duration and date calculations in the schedule.
Lesson 2 • Using Project Codes and UDFs
Defines project codes and user-defined fields to classify and filter projects. These metadata tools enable portfolio-level reporting introduced in later chapters.
Lesson 3 • Defining Project Properties
Covers the Project Details tabs—General, Dates, Budget, and Settings. Accurate properties ensure correct baseline and cost calculations later.
Lesson 4 • Creating a New Project
Walks through the New Project wizard, setting ID, name, planned start, and EPS placement. Each field directly affects reporting and data integrity.
Lesson 5 • Importing and Exporting Project Data
Demonstrates XER, XML, and spreadsheet import/export workflows. Data exchange skills are essential for collaborating with external stakeholders.
Chapter 3HideHide detailsSee detailsBuilding the Work Breakdown Structure
Building the Work Breakdown Structure
Lesson 1 • Creating WBS Elements in P6
Demonstrates adding, indenting, and reordering WBS nodes in the WBS view. Hands-on practice cements the hierarchy before activities are added.
Lesson 2 • WBS Summary Bands and Reporting
Uses WBS summary bands to display rolled-up dates, costs, and progress. Summary views give managers a high-level snapshot without activity detail.
Lesson 3 • WBS Concepts and Best Practices
Explains deliverable-based decomposition, WBS levels, and coding conventions. A sound WBS prevents scope gaps and supports accurate cost rollups.
Lesson 4 • Assigning WBS Codes
Configures automatic and manual WBS code schemes for identification and sorting. Consistent codes are required for filtering and reporting in later chapters.
Chapter 4HideHide detailsSee detailsDefining Activities and Relationships
Defining Activities and Relationships
Lesson 1 • Constraints and Deadlines
Applies start-on, finish-no-later-than, and mandatory constraints alongside deadlines. Overuse of constraints masks true schedule risk, so judicious use is emphasised.
Lesson 2 • Estimating Activity Durations
Applies analogous, parametric, and three-point estimation techniques within P6. Reliable duration estimates are the foundation of a credible schedule.
Lesson 3 • Creating Logical Relationships
Builds FS, SS, FF, and SF relationships using the Relationships dialog and Gantt links. Correct logic eliminates open ends and drives the critical path.
Lesson 4 • Activity Types and Properties
Explains task-dependent, resource-dependent, level of effort, and milestone activity types. Choosing the correct type ensures accurate duration and resource calculations.
Lesson 5 • Applying Lags and Leads
Adds positive lags and negative leads to relationships to model real-world overlaps and delays. Proper lag use avoids artificial float and schedule distortion.
Chapter 5HideHide detailsSee detailsScheduling and Critical Path Analysis
Scheduling and Critical Path Analysis
Lesson 1 • Understanding Float and Critical Path
Interprets total float, free float, and the critical path produced by forward and backward passes. Float values guide prioritisation of management attention.
Lesson 2 • Schedule Health Checks
Runs built-in schedule quality checks against industry metrics for logic density and float. A healthy schedule is a prerequisite for reliable baseline creation.
Lesson 3 • Schedule Compression Techniques
Applies fast-tracking and crashing to shorten the critical path within P6. Students evaluate cost and risk trade-offs before committing to compression.
Lesson 4 • Running the Schedule Calculation
Configures and executes the Schedule function, reviewing data date and calculation options. Understanding these settings prevents common scheduling errors.
Lesson 5 • Analysing Schedule Logic
Uses the Activity Network view and Trace Logic to verify relationship correctness. Logic errors found here prevent costly rework after baselining.
Chapter 6HideHide detailsSee detailsResource and Cost Management
Resource and Cost Management
Lesson 1 • Analysing Resource and Cost Data
Uses histograms, spreadsheets, and usage profiles to review loading and spending plans. Visual analysis reveals peaks and gaps before the project begins execution.
Lesson 2 • Resource Leveling
Applies automatic and manual leveling to resolve over-allocations within float limits. Leveling produces a feasible schedule that respects resource availability.
Lesson 3 • Cost Accounts and Budget Setup
Links activities to cost accounts and enters budget at completion values. Cost accounts enable financial reporting aligned with organisational chart of accounts.
Lesson 4 • Setting Up the Resource Library
Creates labour, nonlabour, and material resources with rates, calendars, and limits. A well-structured library ensures consistent cost calculations across all projects.
Lesson 5 • Assigning Resources to Activities
Uses the Resource Assignment window to link resources and set units or quantities. Assignments drive both schedule duration and budgeted cost calculations.
Chapter 7HideHide detailsSee detailsBaselines and Project Tracking
Baselines and Project Tracking
Lesson 1 • Updating Activity Progress
Records actual start, actual finish, remaining duration, and percent complete for in-progress activities. Accurate updates are the foundation of reliable earned value metrics.
Lesson 2 • Statusing the Schedule
Advances the data date and reschedules to reflect current project status. This process produces updated early/late dates and revised float values.
Lesson 3 • Creating and Assigning Baselines
Copies the approved schedule as a baseline and assigns it as the project or primary baseline. The baseline is the immutable reference for all variance analysis.
Lesson 4 • Earned Value Management in P6
Calculates BCWS, BCWP, ACWP, SPI, and CPI using P6's earned value module. EVM metrics provide objective performance measurement against the approved baseline.
Lesson 5 • Variance Analysis and Reporting
Compares current schedule to baseline using variance columns and bar chart overlays. Variance identification drives corrective action decisions covered in the next chapter.
Chapter 8HideHide detailsSee detailsReporting and Advanced Features
Reporting and Advanced Features
Lesson 1 • Creating Custom Layouts and Views
Designs Gantt, spreadsheet, and activity network layouts with custom columns and filters. Tailored layouts accelerate stakeholder communication and status reviews.
Lesson 2 • Global Change and Mass Updates
Applies Global Change rules to update multiple activities simultaneously based on conditions. Batch updates save time and ensure consistency across large schedules.
Lesson 3 • Dashboards and Portfolios
Configures portfolio dashboards with KPI portlets for executive-level visibility. Portfolio views aggregate data across multiple projects for strategic decision-making.
Lesson 4 • Building Reports in P6
Uses the Report wizard and Report Editor to create tabular and graphical project reports. Custom reports replace manual data extraction and reduce reporting errors.
Lesson 5 • P6 Administration Essentials
Covers user accounts, security profiles, and admin preferences for enterprise P6 setup. Proper administration protects data integrity and controls access across the organisation.
Your valid completion certificate
This course is for you:
Project coordinator: needs to move beyond spreadsheets into professional scheduling tools.
Field engineer: manages site work but lacks formal schedule ownership and control.
Construction manager: wants to interpret and challenge P6 schedules with confidence.
Career changer: transitioning from operations or admin into a project controls role.
Junior planner: has P6 access at work but has never received structured training.
Civil engineering graduate: entering the workforce and building a competitive technical skill set.
What our students say
Your lessons are perfect. I purchased the one-year package and finally have the opportunity to follow various topics of my interest without needing to change platforms... I'm grateful for everything you do, I've already recommended you to other people...

I like how the lessons are straight to the point and how I can change chapters and skip content I don't need.

I like the content and the way videos are presented and transcribed, which speeds up the process!

The platform is fast, simple to use. The diversity of content and complementary videos help a lot with learning.

Top trainings
FAQs
Who is Dedika?
Is the certificate valid in Pakistan?
Are the courses free?
What is the course workload?
What are the courses like?
How do the courses work?
What is the duration of the courses?
What is the cost or price of the courses?
What is an EAD or online course and how does it work?
PDF Course




















