Choose your language
Primavera P6 Course
Over 400,000 professionals on the platform
Exclusive for businesses

Primavera P6 Course

4.5

Master Primavera P6 and take control of complex project schedules with confidence. This course covers everything from building your first work breakdown structure to managing enterprise portfolios and earned value analysis. Whether you're breaking into project controls or advancing your scheduling career, you'll gain the hands-on skills employers demand.

Dedika for students

What your team will master:

You'll learn how to set up projects correctly inside the Enterprise Project Structure, design detailed work breakdown structures, and build logically linked activity networks. The course covers resource loading, cost account setup, and time-phased budgeting so your schedules reflect real project economics. You'll create and manage baselines, track progress, and run earned value calculations to measure performance objectively. Advanced topics include schedule compression, what-if scenario analysis, risk integration, and multi-project portfolio management. By the end, you'll produce professional-grade reports and dashboards that communicate schedule status clearly to any stakeholder.

How your team learns in practice Primavera P6 Course

How your team practices Primavera P6 Course

Professionals from these companies study at Dedika

ActemiumFR
Nunner LogisticsNL
GT Constructora GeotécnicaCR
Sydel StarBR
Metrô de São PauloBR
Aguas AndinasCL
DSMIN
MeridianbetRS
CDHCN

Course content

8 Chapters • 38 LessonsDuration between 4 and 360 hours (you decide)

Chapter 1See details

Introduction to Project Management and P6

  • Lesson 1 • Enterprise Project Structure Basics

    Explains the EPS hierarchy that organizes all projects within P6. Understanding EPS is prerequisite to creating or accessing any project.

  • Lesson 2 • Overview of Primavera P6

    Introduces P6 as an enterprise project portfolio management tool and its core modules. Positions P6 within the broader scheduling software landscape.

  • Lesson 3 • Project Management Fundamentals

    Covers the project lifecycle, constraints, and key terminology used throughout P6. Establishes the conceptual framework needed before touching the software.

  • Lesson 4 • Navigating the P6 Interface

    Guides users through menus, toolbars, and layout panels in P6. Proficiency here accelerates all subsequent hands-on exercises.

Chapter 2See details

Setting Up Projects in P6

  • Lesson 1 • Project Codes and User-Defined Fields

    Introduces project codes and UDFs for filtering, grouping, and reporting across the portfolio. These metadata tools enable enterprise-level analysis.

  • Lesson 2 • Work Breakdown Structure Design

    Builds a hierarchical WBS that organizes project deliverables before activities are added. A well-designed WBS is the backbone of accurate reporting.

  • Lesson 3 • Defining Calendars

    Teaches creation of global and project-specific calendars with work hours and exceptions. Calendars directly control activity duration calculations.

  • Lesson 4 • Creating a New Project

    Walks through the New Project wizard, setting project ID, name, and planned dates. Correct setup here prevents data integrity issues later.

  • Lesson 5 • Configuring Project Settings

    Covers project preferences including default duration type, rate type, and fiscal year. These settings govern how P6 calculates cost and schedule data.

Chapter 3See details

Building the Project Schedule

  • Lesson 1 • Milestones and Hammocks

    Defines milestone and level-of-effort activity types and their scheduling roles. These activity types are essential for reporting and contract deliverables.

  • Lesson 2 • Applying Constraints

    Explains primary and secondary constraints and their impact on schedule flexibility. Overuse of constraints is a common scheduling error addressed here.

  • Lesson 3 • Establishing Activity Relationships

    Teaches the four relationship types and how to create them in the Gantt and network views. Relationships define the logical sequence that drives the schedule.

  • Lesson 4 • Schedule Calculation and Critical Path

    Runs the schedule calculation and interprets forward and backward pass results. Students identify the critical path and understand total and free float.

  • Lesson 5 • Adding and Defining Activities

    Covers activity types, duration types, and data entry methods in the Activity Table. Accurate activity definition is the foundation of a valid schedule.

Chapter 4See details

Resources and Cost Management

  • Lesson 1 • Building the Resource Library

    Creates and configures resources including roles, rates, and calendars in the Resource Dictionary. A complete resource library enables accurate cost and workload planning.

  • Lesson 2 • Assigning Resources to Activities

    Demonstrates resource assignment methods and the relationship between units, duration, and cost. Students control how P6 recalculates when any one variable changes.

  • Lesson 3 • Cost Accounts and Expense Categories

    Sets up the cost account structure and links expenses to activities for budget tracking. Cost accounts enable earned value and financial reporting.

  • Lesson 4 • Resource Leveling

    Applies automatic and manual leveling to resolve overallocation without violating logic. Students balance workload while minimizing schedule impact.

  • Lesson 5 • Analyzing the Resource-Loaded Schedule

    Uses histograms, spreadsheets, and usage profiles to review cost and resource distribution. This analysis validates the budget before baselining.

Chapter 5See details

Baselines and Schedule Control

  • Lesson 1 • Updating Activity Progress

    Covers methods for entering actual dates, percent complete, and remaining duration. Accurate progress entry is the prerequisite for valid schedule analysis.

  • Lesson 2 • Earned Value Management in P6

    Calculates BCWS, BCWP, and ACWP to measure schedule and cost performance. EVM metrics provide objective project health indicators for stakeholders.

  • Lesson 3 • Creating and Assigning Baselines

    Explains baseline types and the process of copying a project to create a frozen snapshot. Proper baseline management is required for meaningful variance analysis.

  • Lesson 4 • Schedule Variance Analysis

    Compares current schedule to baseline using variance columns and Gantt bar styles. Students diagnose schedule slippage and identify recovery opportunities.

  • Lesson 5 • Maintaining Schedule Integrity

    Applies schedule quality checks including logic gaps, open ends, and constraint review. Clean schedule logic ensures reliable critical path and float values.

Chapter 6See details

Reporting and Dashboards

  • Lesson 1 • Exporting Data for External Reporting

    Exports schedule and cost data to spreadsheet and PDF formats for external distribution. Integration with office tools extends P6 reporting to all audiences.

  • Lesson 2 • Configuring P6 Dashboards

    Builds project and portfolio dashboards using portlets for real-time status visibility. Dashboards replace manual status reports with live data views.

  • Lesson 3 • Standard Reports in P6

    Explores the built-in report library covering schedule, resource, and cost categories. Standard reports provide immediate value without custom configuration.

  • Lesson 4 • Creating Custom Reports

    Uses the Report Editor to build tailored reports with filters, grouping, and sorting. Custom reports address stakeholder-specific information requirements.

Chapter 7See details

Multi-Project and Portfolio Management

  • Lesson 1 • Managing Multiple Projects Simultaneously

    Opens and filters multiple projects in a single session for cross-project visibility. This skill is essential for program managers overseeing related projects.

  • Lesson 2 • Global Change and Batch Updates

    Applies the Global Change tool to update multiple activity fields simultaneously. Batch updates save significant time when managing large or complex schedules.

  • Lesson 3 • Portfolio Reporting and Governance

    Generates portfolio-level reports and configures governance thresholds for escalation. Governance reporting supports executive decision-making and portfolio oversight.

  • Lesson 4 • Portfolio Analysis and Prioritization

    Uses portfolio views and scoring models to rank and select projects by strategic value. Portfolio prioritization aligns resource investment with organizational goals.

  • Lesson 5 • Enterprise Resource Management

    Analyzes resource demand across all projects and resolves enterprise-level overallocation. Enterprise leveling prevents resource conflicts between competing projects.

Chapter 8See details

Advanced Scheduling Techniques

  • Lesson 1 • Schedule Compression Techniques

    Applies crashing and fast-tracking methods to recover schedule float and meet deadlines. Students evaluate cost-time trade-offs for each compression option.

  • Lesson 2 • What-If Scenario Analysis

    Creates scenario copies to test schedule alternatives without affecting the live project. Scenario analysis supports informed decision-making before committing to changes.

  • Lesson 3 • Integrating P6 with External Tools

    Exports and imports data between P6 and spreadsheet, BIM, and cost management tools. Integration eliminates duplicate data entry and improves cross-system accuracy.

  • Lesson 4 • Risk Integration in P6

    Links identified risks to activities and assigns probability and impact values in P6. Risk-loaded schedules provide a more realistic view of project outcomes.

  • Lesson 5 • Schedule Optimization and Float Management

    Reviews float distribution and applies logic adjustments to optimize the critical path. Optimized schedules reduce unnecessary constraints and improve predictability.

Certification

Your valid completion certificate

This course is for you:

  • Construction schedulers: ready to move beyond spreadsheet-based planning tools.

  • Project engineers: responsible for tracking milestones on large capital projects.

  • Career changers: transitioning into project controls from adjacent technical fields.

  • Junior planners: looking to formalize their P6 skills for competitive job markets.

  • Program managers: overseeing multiple concurrent projects across an enterprise portfolio.

  • Civil engineering graduates: entering industries where P6 proficiency is a hiring requirement.

Related Courses

FAQ

Who is Dedika?

Is the certificate valid in the United States?

Are the courses free?

What is the course workload?

What are the courses like?

How do the courses work?

What is the duration of the courses?

What is the cost or price of the courses?

What is an EAD or online course and how does it work?

PDF Course