
Boiler installation Course
Get the hands-on technical knowledge you need to install residential and commercial boiler systems to code. This course covers everything from gas pipework and flue design to electrical controls and final commissioning. Whether you are entering the trade or expanding your qualifications, this is the complete installation training you have been looking for.
What you will learn:
You will build a solid foundation in boiler types, thermodynamic principles, and fuel systems before moving into practical installation work. The course walks you through gas supply sizing, pipework techniques, flue routing, and combustion air requirements. You will learn how to mount boilers, connect heating circuits, wire controls, and set up expansion vessels correctly. Commissioning procedures, system balancing, and customer handover documentation are covered in full. Fault diagnosis, energy efficiency optimisation, and low-carbon technology integration round out your training.
How you study in practice Boiler installation Course
How you practise Boiler installation Course
For companies looking to train their teams
With Dedika for businesses, the course includes exercises and examples tailored to your company and its specific needs.
Course content
8 Chapters • 40 LessonsDuration between 4 and 360 hours (you decide)
Chapter 1HideHide detailsSee detailsBoiler Systems: Foundations and Principles
Boiler Systems: Foundations and Principles
Lesson 1 • Core Thermodynamic Principles
Explains heat transfer modes, pressure-temperature relationships, and combustion basics. Provides the physics foundation for all installation and troubleshooting tasks.
Lesson 2 • Boiler Types and Applications
Covers fire-tube, water-tube, and combi boiler designs and their typical use cases. Builds the classification framework used throughout the course.
Lesson 3 • Boiler Components and Functions
Identifies primary components including heat exchangers, burners, and controls. Connects component function to system performance and safety.
Lesson 4 • Fuel Types and Energy Sources
Compares natural gas, propane, oil, and electric boiler energy sources. Informs fuel-specific installation requirements covered in later chapters.
Lesson 5 • Regulatory and Safety Overview
Introduces applicable safety standards, certification requirements, and installer obligations. Sets the compliance mindset required for every subsequent installation task.
Chapter 2HideHide detailsSee detailsTools, Materials, and Site Preparation
Tools, Materials, and Site Preparation
Lesson 1 • Reading Technical Drawings and Schematics
Develops ability to interpret manufacturer installation drawings and system schematics. Accurate drawing interpretation is essential for correct component placement.
Lesson 2 • Pipework Materials and Fittings
Examines copper, steel, and plastic pipe systems along with compatible fittings. Material choice affects corrosion resistance, pressure rating, and installation method.
Lesson 3 • Hand and Power Tools for Installation
Covers pipe cutters, press tools, torque wrenches, and drilling equipment. Correct tool selection prevents damage and ensures code-compliant joints.
Lesson 4 • Personal Protective Equipment and Site Safety
Specifies PPE requirements and site hazard controls for boiler installation environments. Safe site practices are mandatory before any physical work begins.
Lesson 5 • Site Survey and Assessment
Teaches systematic pre-installation surveys covering structural, spatial, and utility factors. Accurate surveys prevent costly mid-installation design changes.
Chapter 3HideHide detailsSee detailsGas Supply and Pipework Installation
Gas Supply and Pipework Installation
Lesson 1 • Pressure Testing and Tightness Checks
Teaches standing pressure tests and let-by tests using gauges and manometers. Documented tightness testing is a mandatory pre-commissioning requirement.
Lesson 2 • Gas Pipework Installation Techniques
Covers jointing methods, support spacing, and routing requirements for gas pipework. Correct installation technique is the primary defence against gas leaks.
Lesson 3 • Pipe Sizing and Flow Calculations
Applies load calculations and pressure drop formulas to select correct pipe diameters. Undersized pipework causes boiler lockout and unsafe operation.
Lesson 4 • Gas Safety Devices and Controls
Identifies flame supervision devices, gas valves, and interlock systems. These devices prevent uncontrolled gas release and are required by safety standards.
Lesson 5 • Gas Supply System Overview
Explains the path from utility meter to boiler, including regulators and isolation valves. Understanding supply infrastructure is prerequisite to sizing and installation work.
Chapter 4HideHide detailsSee detailsFlue and Ventilation Systems
Flue and Ventilation Systems
Lesson 1 • Flue Installation Procedures
Details step-by-step assembly, sealing, and support of flue components. Proper assembly prevents flue gas leakage and structural failure over time.
Lesson 2 • Flue Types and Materials
Compares single-wall, twin-wall, and concentric flue systems and their material ratings. Material and configuration selection must match appliance type and installation location.
Lesson 3 • Flue Performance Testing
Conducts spillage tests, draft measurements, and CO checks to verify flue integrity. Performance testing confirms safe operation before handover to the customer.
Lesson 4 • Combustion Air Requirements
Calculates air supply volumes needed for complete combustion and safe operation. Insufficient combustion air produces carbon monoxide and reduces efficiency.
Lesson 5 • Flue Routing and Termination
Applies clearance rules for flue terminals relative to openings, boundaries, and obstructions. Incorrect termination causes recirculation of combustion gases into occupied spaces.
Chapter 5HideHide detailsSee detailsHeating System Pipework and Layout
Heating System Pipework and Layout
Lesson 1 • Heating System Configurations
Compares one-pipe, two-pipe, and underfloor heating layouts and their hydraulic behaviour. Configuration choice determines balancing strategy and zone control options.
Lesson 2 • Pipework Sizing for Heating Circuits
Applies heat load calculations and velocity limits to size heating pipework correctly. Oversized or undersized pipes cause noise, poor balance, and energy waste.
Lesson 3 • Radiator and Emitter Installation
Covers bracket mounting, valve fitting, and air venting for radiators and fan coil units. Correct emitter installation ensures rated output and prevents air locks.
Lesson 4 • System Flushing and Chemical Treatment
Executes power flushing and inhibitor dosing to remove debris and prevent corrosion. Clean system water is a prerequisite for efficient heat transfer and warranty compliance.
Lesson 5 • Soldering and Brazing Techniques
Develops capillary soldering and high-temperature brazing skills for copper pipework joints. Sound joints are essential for long-term system integrity under pressure cycling.
Chapter 6HideHide detailsSee detailsBoiler Mounting and Mechanical Connection
Boiler Mounting and Mechanical Connection
Lesson 1 • Condensate Disposal Systems
Routes condensate drain to approved disposal points with correct fall and frost protection. Blocked condensate pipes are the most common cause of boiler lockout in cold weather.
Lesson 2 • Domestic Hot Water Connections
Installs cold water inlet, hot water outlet, and pressure-reducing valve for DHW circuits. Correct DHW connection ensures safe water pressure and scalding prevention.
Lesson 3 • Boiler Positioning and Mounting
Applies manufacturer clearance requirements and structural load limits to position and fix the boiler. Incorrect mounting causes vibration damage and access problems.
Lesson 4 • Expansion Vessel Sizing and Setup
Calculates expansion vessel volume and sets pre-charge pressure for sealed systems. Correct setup prevents pressure relief valve discharge and system damage.
Lesson 5 • Flow and Return Pipe Connections
Connects boiler flow and return ports to the heating circuit using correct fittings and unions. Proper connection prevents leaks and allows future servicing without draining the system.
Chapter 7HideHide detailsSee detailsElectrical Wiring and Controls
Electrical Wiring and Controls
Lesson 1 • Thermostat and Programmer Installation
Installs room thermostats, programmers, and cylinder stats to achieve scheduled heating control. Correct placement and wiring maximise comfort and energy efficiency.
Lesson 2 • Zone Valve and Pump Wiring
Wires motorised zone valves, circulator pumps, and their end-switch connections. Correct wiring ensures zone valves open before the pump starts, preventing damage.
Lesson 3 • Smart Controls and System Integration
Configures smart thermostats, weather compensation, and load compensation controls. Advanced controls reduce energy consumption and are increasingly required by efficiency standards.
Lesson 4 • Boiler Wiring Fundamentals
Interprets manufacturer wiring diagrams and connects live, neutral, and earth conductors correctly. Correct wiring prevents control faults, electric shock, and fire risk.
Lesson 5 • Electrical Safety for Boiler Installers
Covers isolation, lock-off, and safe working procedures for low-voltage boiler circuits. Electrical safety compliance is mandatory before any wiring task begins.
Chapter 8HideHide detailsSee detailsCommissioning, Testing, and Handover
Commissioning, Testing, and Handover
Lesson 1 • Initial Boiler Startup Procedure
Follows manufacturer startup sequence including purging, ignition, and fault code monitoring. Correct startup prevents component damage and validates installation quality.
Lesson 2 • Pre-Commissioning Checks
Verifies mechanical, gas, flue, and electrical installations before first ignition. Systematic pre-commissioning prevents damage and ensures safe initial startup.
Lesson 3 • Combustion Analysis and Adjustment
Uses a calibrated combustion analyser to measure CO, CO2, and flue gas temperature. Combustion analysis confirms safe and efficient burner operation at commissioning.
Lesson 4 • System Balancing and Performance Verification
Balances radiator circuits, sets pump speed, and verifies flow temperatures against design. A balanced system delivers rated output and prevents noise and hot or cold spots.
Lesson 5 • Customer Handover and Documentation
Completes commissioning certificates, registers the appliance, and demonstrates operation to the customer. Proper handover fulfils legal obligations and protects the installer from liability.
Your valid completion certificate
This course is for you:
Apprentice plumber: ready to specialise in boiler installation work.
HVAC technician: looking to add gas boiler systems to their skill set.
Career changer: transitioning into the skilled trades from an unrelated field.
Maintenance engineer: responsible for building heating systems needing formal training.
Plumbing contractor: expanding services to include full boiler installation jobs.
Military veteran: applying mechanical aptitude to a civilian trade career.
What our students say
Your lessons are perfect. I purchased the one-year package and finally have the opportunity to follow various topics of interest without needing to change platforms... I'm grateful for everything you do, I've already recommended you to other people...

I like how the lessons are straight to the point and how I can change chapters and skip content I don't need.

I like the content and the way videos are presented and transcribed, which speeds up the process!

The platform is fast, simple to use. The diversity of content and complementary videos really help with learning.

Top qualifications
FAQ
Who is Dedika?
Is the certificate valid in South Africa?
Are the courses free?
What is the course workload?
What are the courses like?
How do the courses work?
What is the duration of the courses?
What is the cost or price of the courses?
What is an EAD or online course and how does it work?
PDF Course




















